Abstract
This report explains about a construction of a raft foundation. A case study is based on the site, which is located at Lot 32, Masjid Ar-Rahman, Kg Gelam, Mukim Kedawang, Daerah Langkawi, Kedah Darul Aman. The objective is to study the installation method of raft foundation and identify the plant and machinery involved in this project. To fulfill the objective, there are two methods of study which are observation and interview. As a conclusion, the installation of raft foundation started from setting out, excavate soil, compacted hardcore, pest control, installation of formwork, DPM and BRC and concrete works. Besides that, the plant and machineries use are mobile crane, excavators, concrete lorry, dump truck, concrete mixer, vibrator and compactor.
Metadata
Item Type: | Monograph (Industrial Training) |
---|---|
Creators: | Creators Email / ID Num. Abd Rahman, Noor Hafizah 2012832138 |
Contributors: | Contribution Name Email / ID Num. Thesis advisor Mat Hasan, Hasni Suryani UNSPECIFIED Thesis advisor Abdullah, Mohd Rofdzi UNSPECIFIED Thesis advisor Wan Ali, Wan Nordiana Binti UNSPECIFIED |
Subjects: | T Technology > TH Building construction > Building fittings and their installation |
Divisions: | Universiti Teknologi MARA, Perak > Seri Iskandar Campus > Faculty of Architecture, Planning and Surveying |
Keywords: | raft foundation, installation method, machineries |
Date: | 2014 |
URI: | https://ir.uitm.edu.my/id/eprint/80396 |