Abstract
In summarization, the report explained on the climbing tower crane system that used to transport all the construction material whether parallel or vertical. The use of tower crane has been an impact to the engineering industry commonly in construction. This technology makes the building design increase in height. The objective, of usage of tower crane will be increase in time, because building nowadays were built in great height because the government or the owner want to save up space of land for another usage. From the research on site that the author made, climbing tower crane construction is not an easy job to do. It needs a serious care from the builder. It is not as easy as some people think. In this practical report, it will briefly explain about theoretically research about climbing tower crane in construction industry. Furthermore, the practical report will also explain about the component that makes the tower crane complete. Then, this practical report will explained about the construction of climbing tower crane from early of construction until the completion of the tower crane. For every construction site, there will be a problem that came out as the builder commencing the construction. So the ability to cope with the problem is important and it needs to have in every person that involved in construction industry. This practical report has enlisted all the problem and way to encounter the problem about the construction of climbing tower crane. Lastly, the author hopes that all the reader that read this practical report book can understand more about the tower crane clearly.
Metadata
Item Type: | Monograph (Industrial Training) |
---|---|
Creators: | Creators Email / ID Num. Rusli, Muhammad Zaid 2011884966 |
Contributors: | Contribution Name Email / ID Num. Thesis advisor Mahayuddin, Siti Akhtar UNSPECIFIED Thesis advisor Abdullah Halim, Anas Zafirol UNSPECIFIED Thesis advisor Abdullah, Mohd Rofdzi UNSPECIFIED |
Subjects: | T Technology > TH Building construction > Construction equipment in building |
Divisions: | Universiti Teknologi MARA, Perak > Seri Iskandar Campus > Faculty of Architecture, Planning and Surveying |
Programme: | Diploma in Building |
Keywords: | climbing tower crane, construction, building design |
Date: | 2013 |
URI: | https://ir.uitm.edu.my/id/eprint/77721 |