Abstract
This report briefly explains about component and method of installation for the new technology of formwork system known as Mivan Formwork. Mivan Formwork has been used widely in construction site for "Cadangan Membina Sebuah Pangsapuri 41 Tingkat (338 unit) (West site 2) Dan Kemudahan Penduduk Serta 6 Paras Podium Tempat Letak Kereta, Sky Bridge Dan 1 Unit Pondok Pengawal Di atas Lot 25951, Jalan Residen Utama, Desa Parkcity, Mukim Batu, Wilayah Persekutuan Kuala Lumpur". This report is finished from my experience and observation that is achieve while having practical training. Mivan Formwork installation is not simple as we thought at first. The installation of Mivan Formwork is difficult and need supervision from the expert to ensure the Mivan Formwork in correct assembly.
Metadata
Item Type: | Monograph (Industrial Training) |
---|---|
Creators: | Creators Email / ID Num. Zamri, Zamirul Azmer 2011604816 |
Contributors: | Contribution Name Email / ID Num. Thesis advisor Ahmad, Suryani UNSPECIFIED Thesis advisor Abdullah Halim, Anas Zafirol UNSPECIFIED Thesis advisor Abdullah, Mohd Rofdzi UNSPECIFIED |
Subjects: | T Technology > TH Building construction > Building fittings and their installation |
Divisions: | Universiti Teknologi MARA, Perak > Seri Iskandar Campus > Faculty of Architecture, Planning and Surveying |
Programme: | Diploma in Building |
Keywords: | mivan formwork, installation, new technology |
Date: | 2013 |
URI: | https://ir.uitm.edu.my/id/eprint/77610 |