Building plan approval process / Muhammad Afiq Che Roha

Che Roha, Muhammad Afiq (2014) Building plan approval process / Muhammad Afiq Che Roha. Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Abstract

This report briefly explain about process of building plan approval. Objective of this report to study the process involve in building plan approval and to identify the problem occur during the building plan approval. Method of study is divided into two methods which are observation and interview method. In observation of study method, this process carried out in working hours. This process begins when the applicant submit the plan at One-Stop (OSC) counter and next processes will be conducted until approval issued by Pasir Mas District Council. In addition, for the interviews conducted during writer methods do practical training. This method can provide a lot of accurate information by interviewing the Mr. Azmi, Mr Kamarul. They were given are goods information to me. Through this method, it is a bit of give and help to the writer to gather information about the research topic of the process approve plan by the Pasir Mas Local Authority method. The finding from this report is the of process of building plan approval is start from applicant send apply to Pasir Mas District Council of One-Stop Centre (OSC) unit, revised application by One-Stop Centre (OSC) unit, checking by technical department, One-Stop Centre (OSC) committee meeting and building plan approval letter give to applicant. Hope with this report can give a lot of advantage and benefit to the render on how to process of building plan approval and the problem occurred.

Metadata

Item Type: Monograph (Industrial Training)
Creators:
Creators
Email / ID Num.
Che Roha, Muhammad Afiq
2012231866
Contributors:
Contribution
Name
Email / ID Num.
Thesis advisor
Wan Ali, Wan Nordiana
UNSPECIFIED
Thesis advisor
Abdullah, Mohd Rofdzi
UNSPECIFIED
Subjects: T Technology > TH Building construction > Building inspection
Divisions: Universiti Teknologi MARA, Perak > Seri Iskandar Campus > Faculty of Architecture, Planning and Surveying
Programme: Diploma in Building
Keywords: building plan approval, process, specifications
Date: September 2014
URI: https://ir.uitm.edu.my/id/eprint/77219
Edit Item
Edit Item

Download

[thumbnail of 77219.pdf] Text
77219.pdf

Download (14MB)

ID Number

77219

Indexing

Statistic

Statistic details