Abstract
This report will review a general procedure on the erection of steel connection in construction and design. It is one of report that comes with complete guidance in every aspect of steel connection for specific project needs. Almost 5 months in practical training at Preserver Bina Sdn. Bhd. I have learnt so much about all steps, proper procedure and all requirements of steel jointing especially on site. Objective of this practical training report is to identify more precisely on how steel jointing are installed at site which is to study the method of steel jointing using the welding method (welding SMAW machine) and to identify welding method used for a few type of steel connection. Many methodology had been used to ensure this report completed, which is Primary Data and Secondary data. As a conclusion, a proper work of installation will definitely need a proper skill of labour and sufficient tools and machineries to do it. As we know all these tools will need to be sufficient enough to make a work become more easy and fast. This is because, not only the installation of work will requires the tools and machineries.
Metadata
Item Type: | Monograph (Industrial Training) |
---|---|
Creators: | Creators Email / ID Num. Hasri, Mohamad Najmuddin 2012621772 |
Contributors: | Contribution Name Email / ID Num. Thesis advisor Abd Rashid, Mohd Najib UNSPECIFIED Thesis advisor Wan Ali, Wan Nordiana UNSPECIFIED Thesis advisor Abdullah, Mohd Rofdzi UNSPECIFIED |
Subjects: | T Technology > TH Building construction > Details in building design and construction.Including walls, roofs |
Divisions: | Universiti Teknologi MARA, Perak > Seri Iskandar Campus > Faculty of Architecture, Planning and Surveying |
Programme: | Diploma in Building |
Keywords: | design & construction, steel jointing, welding method |
Date: | September 2014 |
URI: | https://ir.uitm.edu.my/id/eprint/77218 |