Abstract
This report is explained about the installation of mechanical and electrical (M&E) for office project. It is produced through 5 months practical training experience. This report is divided to several sections and is started with the company and construction project background. Actually, the M&E installation is not easy as what it seems as it include many works and complicated process. Here also simply explained about the types and main components of the installation. Then, here also briefly explained the methods used which involved excavating and installing works. During the construction, there were few problems related to the process methods and there are few suggestions that are believed could solve those problems. As a result, this report could practically explain the process and the method of mechanical and electrical installation to readers.
Metadata
Item Type: | Monograph (Industrial Training) |
---|---|
Creators: | Creators Email / ID Num. Hannah Ghazali, Nur Nabilah 2010562637 |
Contributors: | Contribution Name Email / ID Num. Thesis advisor Ahmad, Suryani UNSPECIFIED Thesis advisor Yahya, Noor Azam UNSPECIFIED Thesis advisor Ahmad, Hayroman UNSPECIFIED |
Subjects: | T Technology > TH Building construction > Building fittings and their installation > Building control systems |
Divisions: | Universiti Teknologi MARA, Perak > Seri Iskandar Campus > Faculty of Architecture, Planning and Surveying |
Programme: | Diploma in Building |
Keywords: | mechanical and electrical, installation, types and main components |
Date: | 2013 |
URI: | https://ir.uitm.edu.my/id/eprint/76985 |