Abstract
This report explained about pile foundations started from the type of piles used at the site until the ground beam. It is made based on five months experience at the site. This report is divided into few chapters which included company's background and project's background. From the observation, it is clearly shows that the construction of the pile foundations is not as easily as it seems. It took a lot of time, labours, and a complicated construction. In this report, it is explained about the type of piles used at the site for the construction of pile foundation for the double-storey terrace houses, the design of the pile caps existed at the site, the level of the column stump and the construction of the ground beam. During the construction, few problems had occurred especially during the pile driving and this report has mentioned the way to solve it. As a conclusion, this report has provided sufficient information about the construction of pile foundations.
Metadata
Item Type: | Monograph (Industrial Training) |
---|---|
Creators: | Creators Email / ID Num. Aris Kamalizan, Adila Syahira 2010830368 |
Contributors: | Contribution Name Email / ID Num. Thesis advisor Othman, Mohamad Hamdan UNSPECIFIED Thesis advisor Yahaya, Noor Azam UNSPECIFIED Thesis advisor Ahmad, Hayroman UNSPECIFIED |
Subjects: | T Technology > TH Building construction > Building fittings and their installation |
Divisions: | Universiti Teknologi MARA, Perak > Seri Iskandar Campus > Faculty of Architecture, Planning and Surveying |
Programme: | Diploma in Building |
Keywords: | construction, pile foundation, double-storey terrace houses |
Date: | 2012 |
URI: | https://ir.uitm.edu.my/id/eprint/76944 |