Interlocking brick IBS / Arif Khairin Rosli

Rosli, Arif Khairin (2021) Interlocking brick IBS / Arif Khairin Rosli. [Student Project] (Unpublished)

Abstract

IBS Interlocking Brick one of the alternative design and construction type that we can have now in Malaysia with take the nature and green house concept the building end develop based on all Al Ansar IBS PLT construction project. This report was conducted for all contractor that use Interlocking Brick that Al Ansar IBS already has been using it for the past year. The objective of this report is to show the Interlocking Brick and how far it fulfills the requirements in the guideline. With use a loadbearing wall design we will change the old conversional type of construction with advantages that this IBS Interlocking Brick can offer to us. The most important consequences of this report is to compile all about Interlocking Brick type and how to build a house that Al Ansar PLT already use for a year in a each project that this company already run.

Metadata

Item Type: Student Project
Creators:
Creators
Email / ID Num.
Rosli, Arif Khairin
UNSPECIFIED
Contributors:
Contribution
Name
Email / ID Num.
Thesis advisor
Yahya, Noor Azam
UNSPECIFIED
Subjects: T Technology > TH Building construction > Details in building design and construction.Including walls, roofs
T Technology > TH Building construction > Management of the construction site. Superintendence of building construction
Divisions: Universiti Teknologi MARA, Perak > Seri Iskandar Campus > Faculty of Architecture, Planning and Surveying
Programme: Diploma in Building Surveying
Keywords: IBS, interlocking brick, construction
Date: 2021
URI: https://ir.uitm.edu.my/id/eprint/72865
Edit Item
Edit Item

Download

[thumbnail of 72865.pdf] Text
72865.pdf

Download (120kB)

Digital Copy

Digital (fulltext) is available at:

Physical Copy

Physical status and holdings:
Item Status:

ID Number

72865

Indexing

Statistic

Statistic details