Abstract
From cities, towns, and even rural areas, the drainage system is essential to enable wastewater and rainwater to move to a treatment plant. Hence, more building means more drains need to be built. Therefore, this report will confer about the construction of surface drainage. The main objective of this report is to ascertain the method statement of drain construction, building quantities, and the problems and solutions throughout this project. The method of study used in this report is document reviews and interviews. The company involved in this project is Juruman Engineering Sdn. Bhd. or in short, JESB. This company is CIDB registered with Grade G6 and Level 5 in Construction Manager. This report is based on a site in Pulau Indah Industrial Park, Mukim Kelang, Daerah Kelang, Selangor D.E. It will focus on how the whole process was done and the importance of drainage systems to developing countries. This report will also look at the construction management and observations during construction work. To summarize, the earliest inspection of the land conditions plays a major role in the succession of drain construction. The drain also must be proven functional to prevent future damage.
Metadata
Item Type: | Student Project |
---|---|
Creators: | Creators Email / ID Num. Mohamad Zamros, Alif Kamal 2019245824 |
Contributors: | Contribution Name Email / ID Num. Thesis advisor Abd Rashid, Mohd Najib UNSPECIFIED |
Subjects: | T Technology > TH Building construction > Details in building design and construction.Including walls, roofs T Technology > TH Building construction > Building fittings and their installation |
Divisions: | Universiti Teknologi MARA, Perak > Seri Iskandar Campus > Faculty of Architecture, Planning and Surveying |
Programme: | Diploma in Building Surveying |
Keywords: | Construction, surface drainage, drainage system |
Date: | 2021 |
URI: | https://ir.uitm.edu.my/id/eprint/72834 |
Download
72834.pdf
Download (115kB)