The obligation of contractor during defect liability period / Muhamad Hafiz Ahmad Azhar

Ahmad Azhar, Muhamad Hafiz (2014) The obligation of contractor during defect liability period / Muhamad Hafiz Ahmad Azhar. Degree thesis, Universiti Teknologi MARA (UiTM).

Abstract

This dissertation contains six chapter that explain about the obligation of contractor during defect liability period. Chapter 1 are compilation of general information about my study. This chapter presents the overall content of the whole project writing. It introduces the subject matter, the problems that are purported to solve. The objective is specified with an appropriate research method to achieve them .Chapter 2 are compilation of literature review. This chapter with the overview the common roles of contractor, preparing to start the contract and classification of contractor. In addition, this chapter also tell about the general information of defect liability period, process of defect liability period, case of defect liability period in Malaysia, and term and condition of defect liability period.

Metadata

Item Type: Thesis (Degree)
Creators:
Creators
Email / ID Num.
Ahmad Azhar, Muhamad Hafiz
UNSPECIFIED
Contributors:
Contribution
Name
Email / ID Num.
Thesis advisor
Mahmood, Mahayudin
UNSPECIFIED
Programme: Bachelor Of Building Surveying (HONS)
Keywords: Contractor, Defect, Information
Date: 2014
URI: https://ir.uitm.edu.my/id/eprint/71294
Edit Item
Edit Item

Download

[thumbnail of 71294.PDF] Text
71294.PDF

Download (46kB)

Digital Copy

Digital (fulltext) is available at:

Physical Copy

Physical status and holdings:
Item Status:
On Shelf

ID Number

71294

Indexing

Statistic

Statistic details