Work study in building operations / Kamal Basha Mohd. Haniffa

Mohd. Haniffa, Kamal Basha (1982) Work study in building operations / Kamal Basha Mohd. Haniffa. [Student Project] (Unpublished)

Abstract

Time Standards for operations or jobs are essential for construction scheduling, wage incentives, cost control and budgeting, comparison of work methods, etc. Direct Time Study, which is the conventional stopwatch technique was used in this project. It requires the job to be timed to be broken down into its constituent elements which are each timed for a sufficient number of occasions. Since the objective of the project was to determine the time required by a qualified worker using a given method at a defined level of performance, it was necessary, whilst timing, to assess the rate of the operator's performance so that the observed time can be converted to Standard time. The addition of allowances was necessary in order to provide time to compensate for contingencies, delays etc.

Metadata

Item Type: Student Project
Creators:
Creators
Email / ID Num.
Mohd. Haniffa, Kamal Basha
UNSPECIFIED
Contributors:
Contribution
Name
Email / ID Num.
Advisor
C.M.M., Aboobucker
UNSPECIFIED
Subjects: H Social Sciences > HD Industries. Land use. Labor > Construction industry
Divisions: Universiti Teknologi MARA, Shah Alam > Faculty of Civil Engineering
Programme: Diploma Lanjutan Kejuruteraan Awam
Keywords: Construction scheduling, qualified worker, work measurement
Date: 1982
URI: https://ir.uitm.edu.my/id/eprint/70759
Edit Item
Edit Item

Download

[thumbnail of 70759.pdf] Text
70759.pdf

Download (727kB)

Digital Copy

Digital (fulltext) is available at:

Physical Copy

Physical status and holdings:
Item Status:
On Shelf

ID Number

70759

Indexing

Statistic

Statistic details