Building plan approval / Asriady Amran

Amran, Asriady (2013) Building plan approval / Asriady Amran. Industrial Training. Universiti Teknologi MARA, Perak.

Abstract

Building plan approval need to be gained before any of construction can be done. The approval of building plan is issued by local authority. The purpose of this report is to understand about Building Plan Approval in term of who can submit the application, document required, the procedure for application of building plan approval and the causes of the plans is rejected by local authority. The case study for this report will explain about the application of building plan approval for 3-storey detached house including the procedure and problem regarding the issue of building plans approval. All the information about building plan approval is gained based on the experience of doing practical training at Kota Kinabalu City Hall for 4 month and also through the interview and study. In conclusion, the plans and document submit for the approval must comply with the requirement of building plan approval and technical agencies.

Metadata

Item Type: Monograph (Industrial Training)
Creators:
Creators
Email / ID Num.
Amran, Asriady
2010949443
Contributors:
Contribution
Name
Email / ID Num.
Thesis advisor
Sudirman, Mohd Dzulkarnaen
UNSPECIFIED
Subjects: T Technology > TH Building construction
T Technology > TH Building construction > Management of the construction site. Superintendence of building construction
T Technology > TH Building construction > Construction by phase of the work (Building trades)
Divisions: Universiti Teknologi MARA, Perak > Seri Iskandar Campus > Faculty of Architecture, Planning and Surveying
Programme: Diploma in Building Surveying
Keywords: Building plan; Document required; Process of application
Date: 2013
URI: https://ir.uitm.edu.my/id/eprint/63885
Edit Item
Edit Item

Download

[thumbnail of 63885.pdf] Text
63885.pdf

Download (5MB)

ID Number

63885

Indexing

Statistic

Statistic details