Abstract
The Bill of Quantities (BOQ) is defined as a list of brief descriptions and estimated quantities. The quantities are defined as estimated because they are subject to admeasurement and are not expected to be totally accurate due to the unknown factors which occur in civil engineering work. The objective of preparing the Bill of Quantities is to assist estimators to produce an accurate tender efficiently and to assist the post contract administration to be carried out in an efficient and cost-effective manner. It should be noted that the quality of the drawings plays a major part in achieving theses aims by enabling the taker-off to produce an accurate bill and also by allowing the estimator to make sound engineering judgments on methods of working.
Metadata
Item Type: | Student Project |
---|---|
Creators: | Creators Email / ID Num. Zulkurnain, Erra Liana 2012269486 |
Contributors: | Contribution Name Email / ID Num. Thesis advisor Zahari, Nurul Fadzila UNSPECIFIED |
Subjects: | T Technology > TA Engineering. Civil engineering > Engineering machinery, tools, and implements |
Divisions: | Universiti Teknologi MARA, Perak > Seri Iskandar Campus |
Programme: | Diploma in Building Surveying |
Keywords: | maintenance at Sungai Tua Quarters |
Date: | 2015 |
URI: | https://ir.uitm.edu.my/id/eprint/61749 |
Download
61749.pdf
Download (351kB)