Abstract
The purposed of writing this report is to explain about the flow of the plan preparation process for local authority submission purposed. The flow is vary important to make the building plan approved. The report also containing the introduction of industrial training which is included the objectives and benefits of industrial training to students. One of the benefits is gain work experience and transferable skills. In chapter 2, the report is about company background which is about Abdul Rahman Company. Abdul Rahman Company was located at Kampung Gong Kepas Dalam, Besut Terengganu. Chapter 2 also included the organizations charts, vision, mission and objectives. Meanwhile, in chapter 3, it is about literature review of plan approval form and certificate. Which is including the type of form that must be filled, the type of the receipt and others. Lastly in chapter 4, my case study is at Pulau Perhentian Kechil,Mukim Bukit Puteri, Daerah Besut, Terengganu which is project of. In this chapter, I will explain more about the flow of the plan preparation process for local authority submission purpose.
Metadata
Item Type: | Student Project |
---|---|
Creators: | Creators Email / ID Num. As Jazri, Nik Nazrul Faisal 2012610478 |
Contributors: | Contribution Name Email / ID Num. Thesis advisor Mat Yasin, Mohd Fadzil UNSPECIFIED |
Subjects: | T Technology > TH Building construction T Technology > TH Building construction > House construction |
Divisions: | Universiti Teknologi MARA, Perak > Seri Iskandar Campus |
Programme: | Diploma in Building Surveying |
Keywords: | Plan preparation process, Building, Engineering |
Date: | 2015 |
URI: | https://ir.uitm.edu.my/id/eprint/61591 |
Download
61591.pdf
Download (535kB)