Abstract
Simulation is a tool use to redesign a virtual process or production flow. This simulation has proven to be the one of the most helpful software in predicting the effect of changes to the manufacturing without putting the risk to the real production. Currently, Autokeen Sdn. Bhd. (AKSB) is having some problems with logistic supporting the production line such as long distance movement from one process to another as well as contributed to excessive utilization of forklift, which can lead to accident and higher material handling cost. As a result, too much idle time between processes and many unnecessary movements have been recorded. Thus, initial investigation has been conducted by using Ishikawa diagram. Based on Ishikawa diagram, the critical problems have been identified, and improvement plans have been proposed in which by designing AGV's pathway. The expected result for project is to eliminate the utilization of forklift at assembly line F D87 A by replacing with Automated Guided Vehicle (AGV) in order to enhance the efficiency of material handling with low risk by Simulating the application of Automated Guided Vehicle (AGV). Subsequently, the return of investment (ROI) has been evaluated.
Metadata
Item Type: | Student Project |
---|---|
Creators: | Creators Email / ID Num. Ahmad Zabidi, Muhammad Syahi 2013440952 |
Contributors: | Contribution Name Email / ID Num. Thesis advisor Ismail, Azianti (Profesor Madya Dr) 205106 |
Subjects: | T Technology > TS Manufactures > Production management. Operations management > Computer-aided design. CAD/CAM systems T Technology > TS Manufactures > Production management. Operations management > Control of production systems > Process control |
Divisions: | Universiti Teknologi MARA, Johor > Pasir Gudang Campus > Faculty of Mechanical Engineering |
Programme: | Bachelor of Engineering (Hons) (Mechanical) |
Keywords: | Workflow, Increase production |
Date: | July 2016 |
URI: | https://ir.uitm.edu.my/id/eprint/61145 |
Download
61145.pdf
Download (139kB)