Improvement of overall efficiency of welding line / Mohd Rahmat Abd Jalil

Abd Jalil, Mohd Rahmat (2009) Improvement of overall efficiency of welding line / Mohd Rahmat Abd Jalil. [Student Project]
Abstract

This project is about the improvement of overall efficiency of Toyota Boshoku UMW welding line 2 that focus on these four elements; Man, Method, Machine and Material. Two main problems have been highlighted which are high stock level of IMV seat :frame and low actual working hours. More work have been covered in improving the current work standard, movements of worker, quality control, equipment and the welding process itself. Toyota Production System approach such as Set Part Supply (SPS), Just In Time (JIT), manpower flexible line (Shojinka) and production by tact time has been applied in this project. The benefit from this project is to reduce stock level and to improve actual working time thus will save space for other production projects and also will eliminate waste.

Item Details
Edit Item
Edit Item
Downloads & Files
[thumbnail of 61085.pdf]
Text
61085.pdf
Download (155kB)
Location & Physical Holdings
Digital Copy
Physical Location
  • Bilik Koleksi Akses Terhad | PTAR Kampus Pasir Gudang, Johor
Item Status
On Shelf
Indexing & Metrics