Abstract
This project is about the improvement of overall efficiency of Toyota Boshoku UMW welding line 2 that focus on these four elements; Man, Method, Machine and Material. Two main problems have been highlighted which are high stock level of IMV seat :frame and low actual working hours. More work have been covered in improving the current work standard, movements of worker, quality control, equipment and the welding process itself. Toyota Production System approach such as Set Part Supply (SPS), Just In Time (JIT), manpower flexible line (Shojinka) and production by tact time has been applied in this project. The benefit from this project is to reduce stock level and to improve actual working time thus will save space for other production projects and also will eliminate waste.
Metadata
Item Type: | Student Project |
---|---|
Creators: | Creators Email / ID Num. Abd Jalil, Mohd Rahmat 2004307310 |
Contributors: | Contribution Name Email / ID Num. Thesis advisor Ismail, Profesor Madya Dr Azianti 205106 |
Subjects: | T Technology > TS Manufactures > Production management. Operations management > Production control > Just-in-time systems T Technology > TS Manufactures > Production management. Operations management > Control of production systems > Inventory control. Radio frequency identification systems |
Divisions: | Universiti Teknologi MARA, Johor > Pasir Gudang Campus > Faculty of Mechanical Engineering |
Programme: | Bachelor of Engineering (Hons) (Mechanical) |
Keywords: | Time management, Production, Quality control |
Date: | 2009 |
URI: | https://ir.uitm.edu.my/id/eprint/61085 |
Download
61085.pdf
Download (155kB)