Improvement of overall efficiency of welding line / Mohd Rahmat Abd Jalil

Abd Jalil, Mohd Rahmat (2009) Improvement of overall efficiency of welding line / Mohd Rahmat Abd Jalil. [Student Project]

Abstract

This project is about the improvement of overall efficiency of Toyota Boshoku UMW welding line 2 that focus on these four elements; Man, Method, Machine and Material. Two main problems have been highlighted which are high stock level of IMV seat :frame and low actual working hours. More work have been covered in improving the current work standard, movements of worker, quality control, equipment and the welding process itself. Toyota Production System approach such as Set Part Supply (SPS), Just In Time (JIT), manpower flexible line (Shojinka) and production by tact time has been applied in this project. The benefit from this project is to reduce stock level and to improve actual working time thus will save space for other production projects and also will eliminate waste.

Metadata

Item Type: Student Project
Creators:
Creators
Email / ID Num.
Abd Jalil, Mohd Rahmat
2004307310
Contributors:
Contribution
Name
Email / ID Num.
Thesis advisor
Ismail, Profesor Madya Dr Azianti
205106
Subjects: T Technology > TS Manufactures > Production management. Operations management > Production control > Just-in-time systems
T Technology > TS Manufactures > Production management. Operations management > Control of production systems > Inventory control. Radio frequency identification systems
Divisions: Universiti Teknologi MARA, Johor > Pasir Gudang Campus > Faculty of Mechanical Engineering
Programme: Bachelor of Engineering (Hons) (Mechanical)
Keywords: Time management, Production, Quality control
Date: 2009
URI: https://ir.uitm.edu.my/id/eprint/61085
Edit Item
Edit Item

Download

[thumbnail of 61085.pdf] Text
61085.pdf

Download (155kB)

Digital Copy

Digital (fulltext) is available at:

Physical Copy

Physical status and holdings:
Item Status:
On Shelf

ID Number

61085

Indexing

Statistic

Statistic details