Staindard Operation Procedure (SOP) to appoint contractor in maintenance work / Muhammad Faizul Md Rani

Md Rani, Muhammad Faizul (2017) Staindard Operation Procedure (SOP) to appoint contractor in maintenance work / Muhammad Faizul Md Rani. [Student Project] (Unpublished)

Abstract

Every building must have their own maintenance program. It is because to make sure the building safe for occupant. For example my case study is Tiara Ampang Condominium and Selaman Biz Park. Both of this building have their own maintenance. For the security, cleaning and lift system in this building have a contractor to handle it. To appoint the contractor, Selaman Sdn Bhd must follow Standard Operation Procedure (SOP).
Standard Operation Procedure is a set of step by step instruction complied by an organization to help workers carry out routine operations. SOPs aim to achieve quality output and uniformity of performance, while reducing miscommunication and failure to comply with industry regulation.
Advantages in practice Standard Operation Procedure while working is minimizing learning downtime. SOPs provide employees with a framework for completing role requirement while minimizing dependence on co-worker’s availability for answering question. Besides, SOP also ensuring understanding of the role. The ability to clearly articulates roles and responsibilities provides assurance that an individual understands the roles and responsibilities. Next, ensuring consistency in the performance of duties. SOPs provide an additional level of assurance of consistency. In conclusion SOP very importance before doing any work daily.

Metadata

Item Type: Student Project
Creators:
Creators
Email / ID Num.
Md Rani, Muhammad Faizul
2013209238
Contributors:
Contribution
Name
Email / ID Num.
Thesis advisor
Mat Yasin, Mohd Fadzil
UNSPECIFIED
Subjects: T Technology > TH Building construction
T Technology > TH Building construction > Contractors
T Technology > TH Building construction > Management of the construction site. Superintendence of building construction
Divisions: Universiti Teknologi MARA, Perak > Seri Iskandar Campus > Faculty of Architecture, Planning and Surveying
Programme: Diploma in Building Surveying
Keywords: Standard Operation Procedure, Building
Date: 2017
URI: https://ir.uitm.edu.my/id/eprint/56843
Edit Item
Edit Item

Download

[thumbnail of 56843.pdf] Text
56843.pdf

Download (339kB)

Digital Copy

Digital (fulltext) is available at:

Physical Copy

Physical status and holdings:
Item Status:

ID Number

56843

Indexing

Statistic

Statistic details