Abstract
This report is about the industrial training at Impiana Hotel, Ipoh for 4 months from 1 December 2016 – 31 Mac 2017.The aim of this report is to summarize the knowledge and activities during internships period. For this industrial training, I have been placed at engineering departments which are operation team and preventive team. In engineering department have operation team, preventive team and boiler team. For the operation team, they do the operation when that have complain for guest and have work order to being repair. For the preventive team is in actions at the prevention of breakdowns and failures. Meanwhile, for the boiler man control the boiler room to make sure boilers to heat water, hot water or steam in good condition. Throughout this industrial training, I have been exposed various equipment used in working environment as preparation before working in real life.
Metadata
Item Type: | Student Project |
---|---|
Creators: | Creators Email / ID Num. Mohmad Omar, Muhammad Hilman 2014696872 |
Contributors: | Contribution Name Email / ID Num. Thesis advisor Ngah Abdul Wahab, Suriani UNSPECIFIED |
Subjects: | T Technology > TK Electrical engineering. Electronics. Nuclear engineering T Technology > TK Electrical engineering. Electronics. Nuclear engineering > Applications of electric power |
Divisions: | Universiti Teknologi MARA, Perak > Seri Iskandar Campus > Faculty of Architecture, Planning and Surveying |
Programme: | Diploma in Building Surveying |
Keywords: | Electrical service, Building services, Engineering |
Date: | 2017 |
URI: | https://ir.uitm.edu.my/id/eprint/56819 |
Download
56819.pdf
Download (306kB)