Abstract
Allhamdulillah finally I can prepare my report, entitled the usage of polyurethane injection in waterproofing works. After undergoing practical training for 3 months under a TGC SDN BHD, I get a lot of new experiences and learn the process of conducting a project. Based on my report , I can see how the worker performs work polyurethane injection from the start to the end of the process is. My case study on the water tank at Felda Tenang, Besut, Terengganu leak due to high water pressure in the water tank that had caused the floor of the tank cracked. The water tank is the main water tank that stores water and supply water to the villagers in the village. They use polyurethane injection to prevent more serious damage. The conclusion is the maintenance management is important for give a comfort to the occupant and it also help to prolong the life cycle of the building.
Metadata
Item Type: | Student Project |
---|---|
Creators: | Creators Email / ID Num. Muhammad Rosdi, Izzati Thaqifah 2013830864 |
Contributors: | Contribution Name Email / ID Num. Thesis advisor Ahmad Zawawi, Zuraihana UNSPECIFIED |
Subjects: | T Technology > TD Environmental technology. Sanitary engineering > Water supply for domestic and industrial purposes T Technology > TH Building construction T Technology > TH Building construction > Construction equipment in building |
Divisions: | Universiti Teknologi MARA, Perak > Seri Iskandar Campus > Faculty of Architecture, Planning and Surveying |
Programme: | Diploma in Building Surveying |
Keywords: | Polyurethane injection in waterproofing works, Maintenance management |
Date: | 2016 |
URI: | https://ir.uitm.edu.my/id/eprint/56584 |
Download
56584.pdf
Download (403kB)