Abstract
This report briefly describes the processes and methods involved in the construction and installation of formwork . It is produced based on the experience of the past four months stationed at the projet site . . This report is divided into sections and begins with the background and the background of the construction project. Observed that the constructio formwork is not as easy as it looks . It involves many parties and the construction of a very complex process . In this report , describe the types and major components of formwork . Then described in more detail about the methods involved and used in construction formwork including construction, mounted with shaped plywood box , followed by finishing work such as tie formwork with steel that looks neat . Formwork during the construction process is underway , a number of problems associated with the method of construction is the lack of
assembly tools such as reinforcement bar , shortages, delays in installation and so on . Finally, the report is to describe in more detail the process and the practical construction of formwork for the reader.
Metadata
Item Type: | Monograph (Industrial Training) |
---|---|
Creators: | Creators Email / ID Num. Muhamad, Muhammad Zulhilmi 2011838572 |
Contributors: | Contribution Name Email / ID Num. Thesis advisor Muhammad Ali, Irwan UNSPECIFIED |
Subjects: | T Technology > TA Engineering. Civil engineering > Building materials T Technology > TA Engineering. Civil engineering > Building materials > Malaysia T Technology > TA Engineering. Civil engineering > Materials of engineering and construction > Concrete T Technology > TA Engineering. Civil engineering > Reinforced concrete T Technology > TA Engineering. Civil engineering > Reinforced concrete > Malaysia |
Divisions: | Universiti Teknologi MARA, Perak > Seri Iskandar Campus > Faculty of Architecture, Planning and Surveying |
Keywords: | Building, Formwork, Construction |
Date: | 2014 |
URI: | https://ir.uitm.edu.my/id/eprint/48512 |