Abstract
Preventive maintenance is one of scope of building surveyor and main core of a building surveying. For a new building that requires maintenance, we need to identify the element and material used in the building in order to identify the period of maintenance. Maintenance is needed especially new building in order to decrease the defects that can reduce the building lifespan and can harm the occupants. For my case study, I choose Kompleks Islam Kuala Selangor. The building was constructed at 26th of March 2013 and estimated finished at the construction 22nd of September 2014 making the construction are delayed due to some problems that arise. The problems are dragging the dateline and the client (JAIS) charged the main contractor with fine. The fine is paid RM1000 per day. Finally the construction is done around February and the handing over are held at Kompleks Islam itself at 1st of March 2016. The roof used in Kompleks Islam Kuala Selangor is pitched roof, flat roof and dome. During my inspection the roof; flat roof has the worst condition as it has many problems before the building was occupied.
Metadata
Item Type: | Monograph (Industrial Training) |
---|---|
Creators: | Creators Email / ID Num. Rostaji, Nurul Azira 2013607138 |
Contributors: | Contribution Name Email / ID Num. Thesis advisor Mohamad Ali, Irwan UNSPECIFIED |
Subjects: | T Technology > TH Building construction > Details in building design and construction.Including walls, roofs T Technology > TH Building construction > Maintenance and repair T Technology > TH Building construction > Building fittings and their installation T Technology > TH Building construction > Building fittings and their installation > Maintenance and repair |
Divisions: | Universiti Teknologi MARA, Perak > Seri Iskandar Campus > Faculty of Architecture, Planning and Surveying |
Keywords: | Maintenance, Roofing, Building surveying |
Date: | 2016 |
URI: | https://ir.uitm.edu.my/id/eprint/48052 |