Abd Samad, Ahmad Fithri and Sulaiman, Rizman Shah
(2017)
Automated compaction table / Ahmad Fithri Abd Samad and Rizman Shah Sulaiman.
In:
Melaka International Intellectual Exposition (MIIEX 2007).
Division of Research and Industry Linkages, Alor Gajah, Melaka.
Abstract
Purpose of this project is to find the best way to improve A320 Spoiler manufacturing process productivity by reducing process cycle time. Due to rate increase from 48 sets per month in 2016 to 56 sets per month in 2017, productivity improvement is required at Tooling and Layup process. Automation has been selected due to part of company KPI which targeted to reduce minimum 15% cycle time. Figure 1 and 2 illustrate the general process flow and process cycle time pareto. Figure 1: A320 Spoiler process flow (As attached). Figure 2: A320 Spoiler process cycle time pareto by process (As attached). Data shows manual compaction table during debulking process is the cause of high manual operation time during layup process.
Metadata
Item Type: | Book Section |
---|---|
Creators: | Creators Email / ID Num. Abd Samad, Ahmad Fithri UNSPECIFIED Sulaiman, Rizman Shah UNSPECIFIED |
Contributors: | Contribution Name Email / ID Num. Patron Mahat, Sabariah UNSPECIFIED Advisor Othman, Rani Diana UNSPECIFIED Advisor Harun, Norazman UNSPECIFIED Advisor Ismail, Shafinar UNSPECIFIED |
Subjects: | H Social Sciences > HD Industries. Land use. Labor > Management. Industrial Management H Social Sciences > HD Industries. Land use. Labor > Management. Industrial Management > Industrial productivity |
Divisions: | Universiti Teknologi MARA, Melaka > Bahagian Penyelidikan dan Jaringan Industri, UiTM Melaka |
Keywords: | Manufacturing process; Process cycle time; Tooling and Layup process |
Date: | 2017 |
URI: | https://ir.uitm.edu.my/id/eprint/47910 |