Abstract
The performance of contractors on their projects shall build upon a foundation of experience and good values. The problem for this project is delay to complete the project by following the duration of time. The performance includes analyzing the delay of construction duration, the quality of work and the liquidated ascertained damage. The methods used for data collection were observation and document
reviews. The research was carried out at a site in Klang Valley area. The objective is to analyse the performance of the main contractor in completing the project based on the duration of work. The research shows that the most prominent factors contributing to poor performance were late of payment to the
workers and suppliers and improper project planning. This led to bad reputation and increased final cost to the developer, including payment to be made to the homebuyers.
Metadata
Item Type: | Conference or Workshop Item (Paper) |
---|---|
Creators: | Creators Email / ID Num. Razali, Muhammad Hakam Ilhan ilhanhakam95@gmail.com Mohd Latif, Hafizah hafizahmohdlatif@gmail.com |
Subjects: | T Technology > TH Building construction > Contractors T Technology > TH Building construction > Management of the construction site. Superintendence of building construction T Technology > TH Building construction > Contractors > Malaysia |
Divisions: | Universiti Teknologi MARA, Perak > Seri Iskandar Campus |
Event Title: | 3rd Undergraduate Seminar on Built Environment and Technology 2018 (USBET2018) |
Event Dates: | September 2018 |
Page Range: | pp. 52-56 |
Keywords: | Construction; Defects; Delay; Extension of Time and Performance |
Date: | 2018 |
URI: | https://ir.uitm.edu.my/id/eprint/46759 |