The Pinnacle Sunway, Subang / Muhammad Hafizuddin ... [et al.]

Muhammad Hafizuddin, Azmi and Muhammad Asyraf, Mohd Nasir and Nabihah, Jamaludin and Nur Arifa, Mohd Yussof and Afiqah Batrisyia, Abdul Aziz (2019) The Pinnacle Sunway, Subang / Muhammad Hafizuddin ... [et al.]. [Student Project]

Abstract

The main purpose for this assignment is to let students gain some knowledge about maintenance organization in a building and how to prepared maintenance organization. In this report, there will be 9 chapters which include the detail of the property, the background of maintenance organization, maintenance policy, maintenance programmed and planning, building design and concept, building condition assessment, maintenance strategy, and legal aspect. In this report, there also included about the tenancy in the building but not in specific details because some of the documents are confidential. Moreover, this report includes about the financial aspect of the building in terms of income and expenditure of the building. These chapters include maintenance forecast for 3 years ahead. The students are using the method of interview and site visit to obtain all the information that needed in this report. Lastly, this report also contains problems and recommendation in chapter 9 which explain every problem that students identified about the building.

Metadata

Item Type: Student Project
Creators:
Creators
Email / ID Num.
Muhammad Hafizuddin, Azmi
2016472524
Muhammad Asyraf, Mohd Nasir
2016472508
Nabihah, Jamaludin
2016472448
Nur Arifa, Mohd Yussof
2016472388
Afiqah Batrisyia, Abdul Aziz
2016491604
Contributors:
Contribution
Name
Email / ID Num.
Thesis advisor
Mohd Fadzil, Mat Yasin
UNSPECIFIED
Subjects: T Technology > TH Building construction > Maintenance and repair
T Technology > TH Building construction > Management of the construction site. Superintendence of building construction
T Technology > TH Building construction > Building inspection
Divisions: Universiti Teknologi MARA, Perak > Faculty of Architecture, Planning and Surveying
Programme: Diploma in Building Surveying
Keywords: Building, Pinnacle Sunway, Subang
Date: 2019
URI: https://ir.uitm.edu.my/id/eprint/33687
Edit Item
Edit Item

Download

[thumbnail of 33687.pdf] Text
33687.pdf

Download (462kB)

Digital Copy

Digital (fulltext) is available at:

Physical Copy

Physical status and holdings:
Item Status:

ID Number

33687

Indexing

Statistic

Statistic details