Abstract
This study focused on the development of a computer program for monitoring of soil
nailing in construction field by using a Microsoft Access database system. The
monitoring of soil nailing in the construction field will be systematic by using the
Microsoft Access database system. In this project, the material, machinery, manpower
and money aspect (4M) will be monitored by using this system. The data from the site in
this project will be collected and key- in in the Microsoft Access database system that
was being developed. In this project, a database system will be monitoring their usage,
quantity, and cost, finished work on that day or other days. From this system we can
reduce the entire item and also know the schedule of the work every time we want. We
will use a wizard to rapidly create the structure for a sophisticated contact management
database, complete with tables, queries, forms and reports. After exploring this database
and entering a few records to get an idea of what a wizard can provide in the way of a
starting point, we will discard this database and start working on monitoring the soil
nailing. This system is a systematic method in collecting data and minimizes the
material, man power, machinery and also the money in soil nailing in construction
engineering.
Metadata
Item Type: | Student Project |
---|---|
Creators: | Creators Email / ID Num. Zainuddin, Maheran UNSPECIFIED |
Subjects: | T Technology > TA Engineering. Civil engineering > Engineering geology. Rock mechanics. Soil mechanics. |
Divisions: | Universiti Teknologi MARA, Pulau Pinang > Permatang Pauh Campus > Faculty of Civil Engineering |
Keywords: | Computer program, Monitoring of soil nailing, Construction |
Date: | 15 November 2006 |
URI: | https://ir.uitm.edu.my/id/eprint/25545 |
Download
PPb_MAHERAN ZAINUDDIN EC P 06_5..pdf
Download (129kB)