Development of NDCDB in E-cadastral environment : case study NDCDB in area of Universiti Teknologi Mara MARA Perlis / Norsyahdira Ahmad

Ahmad, Norsyahdira (2019) Development of NDCDB in E-cadastral environment : case study NDCDB in area of Universiti Teknologi Mara MARA Perlis / Norsyahdira Ahmad. Degree thesis, Universiti Teknologi Mara Perlis.

Abstract

e-Cadastral was implementation under 9th Malaysia plan (2006) which can increase
productivity in surveying technologies. With that, the aim of this study to provides the
National Digital Cadastral Database (NDCDB) in the area of Universiti Teknologi
MARA (UITM), Perlis using the e-Cadastral system. The modem of e-Cadastral
survey technologies software can produce collection and directly automatically
processing survey data during fieldwork. One of the technologies of the e-Cadastral
survey is pre-computation (pre-comp) software. The pre-comp software to produce
the pre-computation plan using the coordinate GDM2000 and also automatic generate
SKL ASCII file. The second of technologies highly advance software in the e-
Cadastral survey is e-Title Survey Module (e-TSM) software. e-TSM software can
view data capture of survey data, and the survey data will electronic record and
calculated which can adopt in the field to finish (F2F) concept under the e-Cadastral
environment. Indirectly, the advances in this e-TSM software also can automatically
generate 16 ASCII file at the same time. So that, the advantages of this method
technology to surveyor are can save time, save cost and also reduce the workforce in
survey work. Other than that, the capabilities of survey instrument also crucial in the
implementation of e-Cadastral such as Total Station ES instrument. This device used
in the e-Cadastral survey to replaces the obsolete land survey instruments. Usually,
the e-Cadastral survey cannot be separated with the accuracy and precision. That why
JUPEM upgrade their method from standard measurement cadastral works process
Bowditch to digital method measurement e-Cadastral work using Least Square
Adjustment. The result data survey must be under tolerance and lowest bound
according to "Pekeliling KPUP Bil.6 Tahun 2009" (PKPUP 2009) to take the
measurement quality of e-Cadastral survey work. In conclusion, the implementation
e-Cadastral in survey depends on the capabilities of instruments and software will get
the real time results data survey and the work will complete on time and efficient.

Metadata

Item Type: Thesis (Degree)
Creators:
Creators
Email / ID Num.
Ahmad, Norsyahdira
UNSPECIFIED
Subjects: Q Science > QA Mathematics > Instruments and machines > Electronic Computers. Computer Science > Computer software > Software measurement
Q Science > QA Mathematics > Instruments and machines > Electronic Computers. Computer Science > Database management
T Technology > TA Engineering. Civil engineering > Surveying
Divisions: Universiti Teknologi MARA, Perlis > Arau Campus > Faculty of Architecture, Planning and Surveying
Keywords: National Digital Cadastral Database (NDCDB) ; pre-computation ; e-Title Survey Module (e-TSM)
Date: 24 June 2019
URI: https://ir.uitm.edu.my/id/eprint/24530
Edit Item
Edit Item

Download

[thumbnail of TD_NORSYAHDIRA AHMAD AP R 19_5.PDF] Text
TD_NORSYAHDIRA AHMAD AP R 19_5.PDF

Download (764kB)

Digital Copy

Digital (fulltext) is available at:

Physical Copy

Physical status and holdings:
Item Status:

ID Number

24530

Indexing

Statistic

Statistic details