Abstract
The Extension of Time (EQT) provision is a mechanism that allows the completion date of a construction project to be modified (when necessary) while also providing protections for the client. This clause may be included in most construction contracts; PWD 203A and PAM 2018. This study highlights the factors for Extension of Time (EQT) claims in infrastructure works. This study aims to identify the factors of EQT claims in infrastructure works and analyze the most approved category of EQT claims in infrastructure works. In achieving these objectives, the quantitative method has been used to collect data for completing the research. Based on the quantitative approach, a questionnaire form was conducted, and 125 respondents took part. The respondents chosen is the contractors from Grade 5 until Grade 7. The questionnaire reveals the factors of extension of time (EQT) claims in infrastructure works and the most approved category of the EQT claims. In the study, descriptive analysis has been used, which is by using Statistical Package for Social Sciences (SPSS).
Metadata
| Item Type: | Student Project |
|---|---|
| Creators: | Creators Email / ID Num. Rosli, Noor Ain Syafiqah 2020854016 |
| Subjects: | H Social Sciences > HD Industries. Land use. Labor > Construction industry H Social Sciences > HJ Public Finance > Expenditures. Government spending T Technology > TH Building construction > Management of the construction site. Superintendence of building construction |
| Divisions: | Universiti Teknologi MARA, Perak > Seri Iskandar Campus > Faculty of Architecture, Planning and Surveying |
| Programme: | Bachelor of Quantity Surveying (Hons) |
| Keywords: | Extension of Time (EOT), Infrastructure construction, Project delays |
| Date: | 2022 |
| URI: | https://ir.uitm.edu.my/id/eprint/129954 |
Download
129954.pdf
Download (185kB)
Digital Copy
Physical Copy
Processing
ID Number
129954
Indexing
