Relationship between schedule delay factors and project performance in civil engineering works / Nurul Mahirah Sharuddin ... [et al.]

Sharuddin, Nurul Mahirah and Azman, Mohd Azrai and Abdul Samad, Zulkiflee and Mohd Rodzi, Rodziana (2024) Relationship between schedule delay factors and project performance in civil engineering works / Nurul Mahirah Sharuddin ... [et al.]. Built Environment Journal, 21: 3. pp. 23-36. ISSN 2637-0395

Abstract

A schedule delay occurs when there is an event or condition that delays the project's commencement or progress. In this case, the completion and delivery of construction projects are deemed ineffective if they fail to satisfy the predetermined criteria, budget, schedule, and stakeholder expectations. As a result, early detection of delays is critical to minimizing their impact on construction project performance. Consequently, this research aims to investigate the relationship between schedule delay factors and project performance in civil engineering works. To achieve this, the contributing factors of schedule delays, the effects of schedule delays and ways that can be taken to overcome schedule delays were identified using questionnaire surveys. The surveys were distributed to G7 civil engineering contractors and 144 were returned. Then, the data collected were analysed using descriptive statistics, Cronbach’s alpha and Kruskal-Wallis test statistics. Based on the research, the study reveals that weakness in the operational system, contractors’ lack of capability in terms of finances and lack of experience of the contractor are the major factors resulting in the delayed completion of civil engineering projects. The findings of the study are intended to offer those involved in civil construction projects appropriate solutions for countering schedule delays.

Metadata

Item Type: Article
Creators:
Creators
Email / ID Num.
Sharuddin, Nurul Mahirah
UNSPECIFIED
Azman, Mohd Azrai
mohdazrai@uitm.edu.my
Abdul Samad, Zulkiflee
UNSPECIFIED
Mohd Rodzi, Rodziana
UNSPECIFIED
Subjects: T Technology > TA Engineering. Civil engineering
Divisions: Universiti Teknologi MARA, Shah Alam > College of Built Environment
Journal or Publication Title: Built Environment Journal
UiTM Journal Collections: Listed > Built Environment Journal (BEJ)
ISSN: 2637-0395
Volume: 21
Page Range: pp. 23-36
Keywords: Schedule delay, schedule delay factors, project performance, effect of delay, civil engineering works
Date: September 2024
URI: https://ir.uitm.edu.my/id/eprint/109930
Edit Item
Edit Item

Download

[thumbnail of 109930.pdf] Text
109930.pdf

Download (370kB)

ID Number

109930

Indexing

Statistic

Statistic details