Abstract
The erection of structural steelwork consists of the assembly of steel components into a frame on site. "I" beams have a variety of important uses in the structural steel construction industry. The observation and information is based on 14 weeks (3 months 1 weeks) on site. This case study are focus on how the method of installation between H pile to column and beam. The main topic discussed in this report is related to the structure of the building based on project "Cadangan membina sebuah bangunan hangar 2 tingkat (Part Task Trainer) di Atas Sebahagian Lot Pt 12135, Pangkalan Udara Subang". This report describe the installation of column and beam for the construction of 2 storey hangar building. To complete this report requires observation and interviews with related individuals. In conclusion this report also contains the problem during the construction and how to overcome it to give a very good building in every aspect of safety.
Metadata
Item Type: | Monograph (Industrial Training) |
---|---|
Creators: | Creators Email / ID Num. Mohamad Salleh, Nur Amira Syuhada 2016614214 |
Contributors: | Contribution Name Email / ID Num. Thesis advisor Mahyuddin, Muhammad Naim UNSPECIFIED Thesis advisor Ismail, Dzulkarnaen UNSPECIFIED |
Subjects: | T Technology > TH Building construction > Building fittings and their installation |
Divisions: | Universiti Teknologi MARA, Perak > Seri Iskandar Campus Universiti Teknologi MARA, Perak > Seri Iskandar Campus > Faculty of Architecture, Planning and Surveying |
Keywords: | installation, column and beam, two storey hangar building |
Date: | 2018 |
URI: | https://ir.uitm.edu.my/id/eprint/100541 |