Abstract
This report briefly described the construction process of precast reinforced concrete (PRC) frame structure focused on beam components. To achieve aimed of this report, two objectives were carried to determine the construction process of precast reinforced concrete of frame structure for IBS that focused on precast RC beams components. The construction work process was deliberated in production, transportation and installation aspects. On the other hand, problems and solution during the process of precast RC beams was also explained. The results revealed that the production, transportation and installation work process of precast reinforcement concrete beam for industrialised building system have been determined. Moreover, the problems and solutions occurred on site have been identify. In conclusion, by implement the IBS in construction nowadays, it can give better quality environment, rapid construction period and reduced waste in a large amount compared to the conventional construction method.
Metadata
Item Type: | Monograph (Industrial Training) |
---|---|
Creators: | Creators Email / ID Num. Kamarul Zaman, Muhammad Aminuddin 2017208718 |
Contributors: | Contribution Name Email / ID Num. Thesis advisor Ahmad, Suryani UNSPECIFIED Thesis advisor Mahyuddin, Muhammad Naim UNSPECIFIED Thesis advisor Ismail, Dzulkarnaen UNSPECIFIED |
Subjects: | T Technology > TH Building construction > Systems of building construction. Industrialized building |
Divisions: | Universiti Teknologi MARA, Perak > Seri Iskandar Campus Universiti Teknologi MARA, Perak > Seri Iskandar Campus > Faculty of Architecture, Planning and Surveying |
Keywords: | construction process, precast reinforced concrete, Industrialised Building System (IBS) |
Date: | 2019 |
URI: | https://ir.uitm.edu.my/id/eprint/100536 |