Post concrete work / Amir Hamzah Rashid Ridha

Rashid Ridha, Amir Hamzah (2019) Post concrete work / Amir Hamzah Rashid Ridha. Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Abstract

Post concrete was a very important part in construction, therefore this report will discuss the sequence work of post concrete after the casting work and removal of formwork. This report was conducted for 48-storey office tower located at Jalan lmbi, Bukit Bintang. The objective of this report is to know the sequence work of post concrete, identify concrete problems on site and to know the rectification work for post concrete. To ensure the quality of the concrete and avoid any incident caused by poor concrete condition in the future. This report will explain the right procedure of post concrete work and what kind of defect on concrete that usually appeared after the removal of formwork.

Metadata

Item Type: Monograph (Industrial Training)
Creators:
Creators
Email / ID Num.
Rashid Ridha, Amir Hamzah
2017213312
Contributors:
Contribution
Name
Email / ID Num.
Thesis advisor
Mahyuddin, Muhammad Naim
UNSPECIFIED
Thesis advisor
Ismail, Dzulkarnaen
UNSPECIFIED
Subjects: T Technology > TH Building construction > Building fittings and their installation
Divisions: Universiti Teknologi MARA, Perak > Seri Iskandar Campus
Universiti Teknologi MARA, Perak > Seri Iskandar Campus > Faculty of Architecture, Planning and Surveying
Keywords: post concrete work, problem, rectification
Date: 2019
URI: https://ir.uitm.edu.my/id/eprint/100383
Edit Item
Edit Item

Download

[thumbnail of 100383.pdf] Text
100383.pdf

Download (12MB)

ID Number

100383

Indexing

Statistic

Statistic details