Yusri, Nursyahirah
(2019)
Post contract work during defect liability period / Nursyahirah Yusri.
Industrial Training.
Universiti Teknologi MARA, UiTM Perak.
(Submitted)
Abstract
Post contract work, the last stage of the construction of building is important and should not be taken lightly by anyone, therefore this report will discuss about rectification of building defects during defect liability period. The defect liability period is the period of time from the date of delivery of vacant possession and keys delivered, where the developer is responsible to fix any defects occurred or found. Within this period, the homeowner will need to check for any damage, defects, as well as poor or faulty workmanship and need to report back to the developer if there are any issues of defect to get them repaired for free
Metadata
Item Type: | Monograph (Industrial Training) |
---|---|
Creators: | Creators Email / ID Num. Yusri, Nursyahirah 2017243474 |
Contributors: | Contribution Name Email / ID Num. Thesis advisor Yahaya, Nor Azam UNSPECIFIED Thesis advisor Mahyuddin, Muhammad Naim UNSPECIFIED Thesis advisor Ismail, Dzulkarnaen UNSPECIFIED |
Subjects: | T Technology > TH Building construction > Building failures, errors, defects, etc. |
Divisions: | Universiti Teknologi MARA, Perak > Seri Iskandar Campus Universiti Teknologi MARA, Perak > Seri Iskandar Campus > Faculty of Architecture, Planning and Surveying |
Keywords: | post contract work, defect liability period, developer |
Date: | 2019 |