Post contract work during defect liability period / Nursyahirah Yusri

Yusri, Nursyahirah (2019) Post contract work during defect liability period / Nursyahirah Yusri. Industrial Training. Universiti Teknologi MARA, UiTM Perak. (Submitted)

Abstract

Post contract work, the last stage of the construction of building is important and should not be taken lightly by anyone, therefore this report will discuss about rectification of building defects during defect liability period. The defect liability period is the period of time from the date of delivery of vacant possession and keys delivered, where the developer is responsible to fix any defects occurred or found. Within this period, the homeowner will need to check for any damage, defects, as well as poor or faulty workmanship and need to report back to the developer if there are any issues of defect to get them repaired for free

Metadata

Item Type: Monograph (Industrial Training)
Creators:
Creators
Email / ID Num.
Yusri, Nursyahirah
2017243474
Contributors:
Contribution
Name
Email / ID Num.
Thesis advisor
Yahaya, Nor Azam
UNSPECIFIED
Thesis advisor
Mahyuddin, Muhammad Naim
UNSPECIFIED
Thesis advisor
Ismail, Dzulkarnaen
UNSPECIFIED
Subjects: T Technology > TH Building construction > Building failures, errors, defects, etc.
Divisions: Universiti Teknologi MARA, Perak > Seri Iskandar Campus
Universiti Teknologi MARA, Perak > Seri Iskandar Campus > Faculty of Architecture, Planning and Surveying
Keywords: post contract work, defect liability period, developer
Date: 2019
URI: https://ir.uitm.edu.my/id/eprint/100344
Edit Item
Edit Item

Download

[thumbnail of 100344.pdf] Text
100344.pdf

Download (9MB)

ID Number

100344

Indexing

Statistic

Statistic details