Items where Division is "Faculty of Business and Management" and Year is 1994

Group by: Creators | Item Type | No Grouping
Jump to: A | B | H | I | M | N | O | S | W | Y
Number of items: 32.

A

Marketing plan: the development and establishment of the GFSB showrooms / Aizatul Azhar Abd Ghani. (1994) [Student Project] (Unpublished)

Semai Impian Sdn Bhd Executive coach: an analysis on diversification of service in promoting the executive coach operation / Miftah Abd Mutalib. (1994) [Student Project] (Unpublished)

The evaluations on scheduling and routing of Maju stage bus services in Dato'Onn area towards Johor Bahru city status / Norhayati Abd.Rahman. (1994) Degree thesis, thesis, Universiti Teknologi MARA.

Liquidity analysis of finance companies and effect of economic indicators: a liquidity management perspective / Hezal Ahmad. (1994) [Student Project] (Unpublished)

Evaluating risks and returns of preference shares and the possibilities to introduce an Islamic Proposed formula of preference shares / Zaidun Ahmad. (1994) [Student Project] (Unpublished)

B

A study on how tourism Malaysia promote Malaysia as a major tourist destination / Aini Dakhlah Baharuddin. (1994) [Student Project] (Unpublished)

H

The profitability analysis of factoring companies in Malaysia / Mohd Ridhuan Harun. (1994) Diploma thesis, thesis, Universiti Teknologi MARA.

A study of customer service rendered by Container Haulage, Kontena National, (Port Klang) / Hazlinda Hashim. (1994) [Student Project] (Unpublished)

A study on bumiputera investment in manufacturing sector in Malaysia (1984 -1993) / Mohd. Hafis Hashim. (1994) [Student Project] (Unpublished)

The analysis of relationship between profitability ratios of finance companies with economic indicators and market interest rates / Mohd Kamal Husin. (1994) [Student Project] (Unpublished)

I

Analysis on the frequency of passenger train delay (Keretapi Tanah Melayu Berhad) / Khadijah Ishak. (1994) Degree thesis, thesis, Universiti Teknologi MARA.

Planning for public transport access from Kuala Lumpur to National Sport Complex / Sharizal Ismail. (1994) [Student Project] (Unpublished)

M

Beta of shares on the second board / Rozita Mohamed. (1994) [Student Project] (Unpublished)

A study on the operational problems of conventional breakbulk general cargo handling system and its future prospect in KPM Sdn Bhd / Norteja Mohd Hussain Albakri. (1994) [Student Project] (Unpublished)

A one year plan for Pennzoil passenger car motor oils / Mohd Noor Afandy Mohd Jaya. (1994) Diploma thesis, thesis, Insititut Teknologi MARA.

The arbitrage pricing theory : a study on the risk- return relationship in the Kuala Lumpur stock exchange / Mohd Lokman Mohd Kassim. (1994) [Student Project] (Submitted)

A feasibility study to introduce modern city buses for intra city operations by the year 2000 / Ahmad Khairul Mohd Khusairi. (1994) [Student Project] (Unpublished)

A study on the effect of vessels delay and shut out of containers on MISC coastal liner service / Mohd Suhaimi Akbar Mohd Ramli. (1994) Diploma thesis, thesis, Mara Institute of Technology.

The role of public transport (stage bus) in providing mobility to the impaired travellers in Kuala Lumpur with reference to SJ Kenderaan Sendirian Berhad / Mizahanita Mohd. Din. (1994) [Student Project] (Unpublished)

The effectiveness of material handling towards upgrading the operations of Sime Swede Distribution Services / Sukmawati Mohd. Sanusi. (1994) Degree thesis, thesis, Universiti Teknologi MARA.

Bus service in Damansara and its surrounding areas (Sri Jaya no.244) / Rozainor Mohd. Yunus. (1994) Degree thesis, thesis, Universiti Teknologi MARA.

The application of information technology in the light rapid transit organisation / Anida Muda. (1994) [Student Project] (Unpublished)

Investment opportunities in Subang Jaya focus on : the popular types of development and their respective yields / Rohainee Muhamad. (1994) Degree thesis, thesis, Universiti Teknologi MARA.

The impact of demand deposit and time deposit on the statutory reserve requirement / Hasri Mustafa @ Abdul Razak. (1994) [Student Project] (Submitted)

N

Logistics customer service: analysis regards to implementation of order processing in Shapadu Kontena Berhad / Abdul Halim N. C. Mohamad. (1994) [Research Reports] (Unpublished)

Feeder - bus network for LRT at Gombak area / Yusra Narais. (1994) [Student Project] (Unpublished)

O

Ekspres Nasional Berhad then, now and future / Nurhayati Othman. (1994) Diploma thesis, thesis, Universiti Teknologi MARA Shah Alam.

S

Factors influencing the rate of returns on initial public offerings a study on : KLSE’s second board / Rashdan Saferan Saat. (1994) Degree thesis, thesis, Universiti Teknologi MARA.

A study on safety aspects of container fleet movement in reference to Kontena Nasional Sdn. Bhd. at Port Klang / Al Zelan Shamsudin. (1994) [Student Project] (Unpublished)

A study on the service quality and consumers perception towards it / Shuhaniza Shamsul Khalil. (1994) [Student Project] (Unpublished)

W

Fleet operation at ICD in relation to Kontena Nasional Sdn. Berhad / Wan Faizal Sazali Wan Mohd. Isa. (1994) [Student Project] (Unpublished)

Y

Container undischarged problem in Nepline Sdn. Bhd (Port Klang Branch) / Anuar Yazid. (1994) [Student Project] (Unpublished)

This list was generated on Fri Apr 19 00:25:59 2024 UTC.