Abstract
This thesis examines the factors contributing to delays in construction projects and their impacts on project outcomes. Construction projects often face challenges and delays that significantly impact project schedules, costs, and client satisfaction. Understanding these factors and their consequences is crucial for successfully managing and completing construction projects. The study employs a comprehensive research methodology, including literature reviews, data collection, and analysis of real-world construction projects. The data collected encompass various project types, sizes, and geographical locations to ensure a broad industry representation. The findings reveal several key factors that contribute to delays in construction projects. The findings and recommendations outlined in this thesis offer valuable insights for practitioners, policymakers, and researchers and drive positive changes in project management practices.
Metadata
Item Type: | Conference or Workshop Item (Paper) |
---|---|
Creators: | Creators Email / ID Num. Rusni, Muhammad Khairul Khusyairi 2021459464@student.uitm.edu.my Syed Mustapa, Syed Abdul Haris syeda488@uitm.edu.my |
Contributors: | Contribution Name Email / ID Num. Thesis advisor Mizal Azzmi, Norazura UNSPECIFIED Thesis advisor Ahzahar, Nadira UNSPECIFIED Editor Ahmad Zawawi, Zuraihana UNSPECIFIED Editor Jamaludin, Nazhatulzalkis UNSPECIFIED Editor Hashim, Siti Zubaidah UNSPECIFIED |
Subjects: | T Technology > TH Building construction > Management of the construction site. Superintendence of building construction |
Divisions: | Universiti Teknologi MARA, Perak > Seri Iskandar Campus > Faculty of Architecture, Planning and Surveying |
Journal or Publication Title: | e-Proceeding 6th Undergraduate Seminar on Built Environment and Technology (USBET) 2023 |
Page Range: | pp. 146-160 |
Keywords: | construction, delay, impact |
Date: | October 2023 |
URI: | https://ir.uitm.edu.my/id/eprint/97174 |