The factors contributing to construction cost overruns in Perak / Muhammad Farhan Mansor and Mohamad Haszirul Mohd Hashim

Mansor, Muhammad Farhan and Mohd Hashim, Mohamad Haszirul (2023) The factors contributing to construction cost overruns in Perak / Muhammad Farhan Mansor and Mohamad Haszirul Mohd Hashim. In: UNSPECIFIED.

Abstract

Cost increase has severely hit down the economy and reputations for many constructions industry around the world. Thus, this paper aims to identify and cluster the potential construction project cost increase factors. Basically, through literature review, all the potential factors that may cause cost increase were screened thoroughly before they were clustered into of the originating factors, namely project, contract, client, contractor. Meanwhile, the predominant causes of cost increase were poor preconstruction budget and material cost planning, inaccurate quantity take-off and materials cost increased by inflation. The significance of establishing the issues related to time and cost increases for the high-rise building construction project is to provide a greater insight and understanding on the causes of delays, particularly among the main project players: contractors, client, and consultants. The study identifies cost increase in construction industry and purpose of the finding to allowed recommendations to be made regarding budget management in building construction based on contractor view.The analysis of the responses reveals interesting insights regarding the impact of improper planning in construction on increasing costs. The analysis indicates that a significant majority of respondents recognize the correlation between improper planning in construction and an increasing cost.

Metadata

Item Type: Conference or Workshop Item (Paper)
Creators:
Creators
Email / ID Num.
Mansor, Muhammad Farhan
farhanmansor29@gmail.com
Mohd Hashim, Mohamad Haszirul
haszirul@uitm.edu.my
Contributors:
Contribution
Name
Email / ID Num.
Chief Editor
Mizal azzmi, Norazura
UNSPECIFIED
Chief Editor
Ahzahar, Nadira
UNSPECIFIED
Editor
Ahmad Zawawi, Zuraihana
UNSPECIFIED
Editor
Jamaludin, Nazhatulzalkis
UNSPECIFIED
Editor
Hashim, Siti Zubaidah
UNSPECIFIED
Subjects: T Technology > TH Building construction > Estimates. Measurements. Quantities and cost
Divisions: Universiti Teknologi MARA, Perak > Seri Iskandar Campus > Faculty of Architecture, Planning and Surveying
Journal or Publication Title: e-Proceeding 6th Undergraduate Seminar on Built Environment and Technology (USBET) 2023
Page Range: pp. 401-412
Keywords: Budget, building, contractor, construction, cost
Date: October 2023
URI: https://ir.uitm.edu.my/id/eprint/97108
Edit Item
Edit Item

Download

[thumbnail of 97108.pdf] Text
97108.pdf

Download (9MB)

ID Number

97108

Indexing

Statistic

Statistic details