Preparation of bill of quantities / Mohamad Aiman Hafiz Jamil

Jamil, Mohamad Aiman Hafiz (2018) Preparation of bill of quantities / Mohamad Aiman Hafiz Jamil. Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Abstract

Bill of Quantity (BoQ) is a document used by quantity surveyors to estimate the cost of a project. The main objective that was discussed in this report is related to preparing a Bill of Quantity of a construction of 3 units recreational huts in the recreational park Sungai Kapeh, Segamat, Johor Darul Takzim. This report elaborates the method to prepare a Bill of Quantity. It also describes what are the item that usually listed in the taking off list. In conclusion, this report includes the requirements for BoQ and the process of preparing BoQ which will be used by Civil Engineer or Quantity Surveyor. Observations, Q&A sessions and Document review were required to finish this task. In conclusion, this repo1is provide the process for preparing a Bill of Quantites (BoQ) which are the main elements in a construction.

Metadata

Item Type: Monograph (Industrial Training)
Creators:
Creators
Email / ID Num.
Jamil, Mohamad Aiman Hafiz
2016618062
Contributors:
Contribution
Name
Email / ID Num.
Thesis advisor
Yahaya, Noor Azam
UNSPECIFIED
Thesis advisor
Mahyuddin, Muhammad Naim
UNSPECIFIED
Thesis advisor
Ismail, Dzulkarnaen
UNSPECIFIED
Subjects: T Technology > TH Building construction > Estimates. Measurements. Quantities and cost
Divisions: Universiti Teknologi MARA, Perak > Seri Iskandar Campus
Universiti Teknologi MARA, Perak > Seri Iskandar Campus > Faculty of Architecture, Planning and Surveying
Keywords: preparation, bill of quantities, requirements and process
Date: 2018
URI: https://ir.uitm.edu.my/id/eprint/97076
Edit Item
Edit Item

Download

[thumbnail of 97076.pdf] Text
97076.pdf

Download (9MB)

ID Number

97076

Indexing

Statistic

Statistic details