Post COVID-19 : impact of labour insufficiency in construction sites / Mohammad Ikmal Azmi and Norazlin Mat Salleh

Azmi, Mohammad Ikmal and Mat Salleh, Norazlin (2023) Post COVID-19 : impact of labour insufficiency in construction sites / Mohammad Ikmal Azmi and Norazlin Mat Salleh. In: UNSPECIFIED.

Abstract

The COVID-19 pandemic become a significant impact on the construction industry, including the labour supply. The pandemic has led to several challenges for construction companies, including many construction workers have been infected with COVID-19. The objective of this research is to identify the impact of labour insufficiency in construction sites after COVID-19 pandemic. Quantitative method is used in this research. The questionnaires distributed to 55 respondents to contractors G7 at Perak. All the data were analysed by using SPSS version 29 software in descriptive analysis. The finding shows the impact of labour insufficiency are companies financial losses, project delay, construction productivity and labours joint athers industries. This research can be used as a reference to the contractor if there is any contagious outbreak.

Metadata

Item Type: Conference or Workshop Item (Paper)
Creators:
Creators
Email / ID Num.
Azmi, Mohammad Ikmal
2021454936@student.uitm.edu.my
Mat Salleh, Norazlin
noraz470@itm.edu.my
Contributors:
Contribution
Name
Email / ID Num.
Chief Editor
Mizal Azzmi, Norazura
UNSPECIFIED
Chief Editor
Ahzahar, Nadira
UNSPECIFIED
Editor
Ahmad Zawawi, Zuraihana
UNSPECIFIED
Editor
Jamaludin, Nazhatulzalkis
UNSPECIFIED
Editor
Hashim, Siti Zubaidah
UNSPECIFIED
Subjects: T Technology > TH Building construction > Management of the construction site. Superintendence of building construction
Divisions: Universiti Teknologi MARA, Perak > Seri Iskandar Campus
Universiti Teknologi MARA, Perak > Seri Iskandar Campus > Faculty of Architecture, Planning and Surveying
Journal or Publication Title: e-Proceeding of 6th Undergraduate Seminar on Built Environment and Technology (USBET) 2023
Page Range: pp. 101-106
Keywords: covid-19, labour, construction industry, construction workers
Date: 2023
URI: https://ir.uitm.edu.my/id/eprint/95216
Edit Item
Edit Item

Download

[thumbnail of 95216.pdf] Text
95216.pdf

Download (9MB)

ID Number

95216

Indexing

Statistic

Statistic details