Abstract
The construction industry is the backbone for the development of Malaysia. The objective of this report is to investigate the processes and procedures of building plan approval, identify the specifications of technical reviews and to determine the status of approvals. This report is conducted through observations, interviews experienced staff and review of some crucial documents that involved during the approval work. Therefore, the findings of this report is about the whole progress on the management of the development process in compliance with procedures and regulations as stipulated by law. Therefore, all the aspects of development must be based on current legal requirements until the project was completed. This industrial training report consists of 5 chapters which is introduction, literature review, case study, process and conclusion. Chapter 1 consist of background of the organization, chapter 2 consist of literature review about project, chapter 3 consist of case study the procedure of development approval for public housing project 1 Malaysia and detail project process and procedure while chapter 4 and chapter 5 consist of conclusion of the report. In order to complete the requirement, student needs to complete at least seventeen (17) weeks of industrial training which is starting from 10th October 2021 until 30th January 2022. In this Technical Department, I have follow to works on site and helping works in the office. During my placement, I have learned a lot of new knowledge about road maintenance and construction works. This knowledge are useful for me in future and gives me a lot of advantages to prepare myself for my future career.
Metadata
Item Type: | Monograph (Industrial Training) |
---|---|
Creators: | Creators Email / ID Num. Md Asam, Nor Asmaniza 2018401578 |
Contributors: | Contribution Name Email / ID Num. Thesis advisor Md Asam, Nor Asmaniza UNSPECIFIED |
Subjects: | T Technology > TH Building construction > House construction T Technology > TX Home economics > The house. Including arrangement, care, servants |
Divisions: | Universiti Teknologi MARA, Perak > Seri Iskandar Campus Universiti Teknologi MARA, Perak > Seri Iskandar Campus > Faculty of Architecture, Planning and Surveying |
Keywords: | Public housing project 1 Malaysia |
Date: | 2022 |
URI: | https://ir.uitm.edu.my/id/eprint/91680 |