A case study on pre-commissioning of power transformer / Mohd Harith Ahmad

Ahmad, Mohd Harith (2013) A case study on pre-commissioning of power transformer / Mohd Harith Ahmad. Degree thesis, Universiti Teknologi MARA (UiTM).

Abstract

After new power transformer has been set up on site and before it connect with power supply and loading the load, it is must to have to go through numbers of testing procedures for confirming the specifications and performances of a power transformer. The purpose of commissioning tests on transformer is to satisfy, to pre determined standards, that all the equipment erection is correct and that all the equipment connections or cables have been installed in accordance with the approved erection drawings and diagrams. This paper describes about some testing before commissioning of power transformer at site (Penang Port Sdn.Bhd., Pulau Pinang).

Metadata

Item Type: Thesis (Degree)
Creators:
Creators
Email / ID Num.
Ahmad, Mohd Harith
UNSPECIFIED
Contributors:
Contribution
Name
Email / ID Num.
Thesis advisor
Che Mat Haris, Harizan
UNSPECIFIED
Divisions: Universiti Teknologi MARA, Shah Alam > Faculty of Electrical Engineering
Programme: Bachelor of Electrical Engineering (Hons.)
Keywords: transformer, power,
Date: 2013
URI: https://ir.uitm.edu.my/id/eprint/84482
Edit Item
Edit Item

Download

[thumbnail of 84482.pdf] Text
84482.pdf

Download (150kB)

Digital Copy

Digital (fulltext) is available at:

Physical Copy

Physical status and holdings:
Item Status:
On Shelf

ID Number

84482

Indexing

Statistic

Statistic details