Ahmad, Mohd Harith
(2013)
A case study on pre-commissioning of power transformer / Mohd Harith Ahmad.
Degree thesis, Universiti Teknologi MARA (UiTM).
Abstract
After new power transformer has been set up on site and before it connect with power supply and loading the load, it is must to have to go through numbers of testing procedures for confirming the specifications and performances of a power transformer. The purpose of commissioning tests on transformer is to satisfy, to pre determined standards, that all the equipment erection is correct and that all the equipment connections or cables have been installed in accordance with the approved erection drawings and diagrams. This paper describes about some testing before commissioning of power transformer at site (Penang Port Sdn.Bhd., Pulau Pinang).
Metadata
Item Type: | Thesis (Degree) |
---|---|
Creators: | Creators Email / ID Num. Ahmad, Mohd Harith UNSPECIFIED |
Contributors: | Contribution Name Email / ID Num. Thesis advisor Che Mat Haris, Harizan UNSPECIFIED |
Divisions: | Universiti Teknologi MARA, Shah Alam > Faculty of Electrical Engineering |
Programme: | Bachelor of Electrical Engineering (Hons.) |
Keywords: | transformer, power, |
Date: | 2013 |
URI: | https://ir.uitm.edu.my/id/eprint/84482 |
Download
Text
84482.pdf
Download (150kB)
84482.pdf
Download (150kB)
Digital Copy
Digital (fulltext) is available at:
Physical Copy
Physical status and holdings:
Item Status:
On Shelf