Abstract
Super structure is one of the major components in building, this is an interesting thing to elaborate. Therefore, this report will discuss about super structure work, based on CIS-9_2008, JRK 20800, CIS18_2018, This report was conducted at Semi-Detached factories at I-Park SAC, Senai, Johor. The objective of this report is to investigate how super structure work being managed in construction site and how it will affect the building condition if one of the components is missing. This will focus on how super structure work being done and to illustrate the function of super structure work in building construction that not only being focus on external and internal only and then to evaluate the super structure work that can be fulfill the building criteria that have been prescribed by the requirement of British Standard (BS) and (British Standard European Norm (BS EN). This report will also look at work progression for super structure building and to evaluate at qualities of material use for superstructure work based on British Standard (BS) and Malaysian Standard (MS)
Metadata
Item Type: | Monograph (Industrial Training) |
---|---|
Creators: | Creators Email / ID Num. Shahrin, Mohamad Solehin 201940766 |
Contributors: | Contribution Name Email / ID Num. Thesis advisor Rosman, Muhammad Redza UNSPECIFIED Thesis advisor Mahyuddin, Muhammad Naim UNSPECIFIED Thesis advisor Ismail, Dzulkarnaen UNSPECIFIED |
Subjects: | T Technology > TH Building construction > Building fittings and their installation |
Divisions: | Universiti Teknologi MARA, Perak > Seri Iskandar Campus > Faculty of Architecture, Planning and Surveying |
Keywords: | Super structure work, semi-detached factories, construction site |
Date: | 2021 |
URI: | https://ir.uitm.edu.my/id/eprint/83925 |