Conventional slab construction / Nuraini Abdullah

Abdullah, Nuraini (2014) Conventional slab construction / Nuraini Abdullah. Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Abstract

This report briefly describes the processes and methods involved in the construction of conventional slabs. It is produced based on the experience of five months on a construction site. This repo1t is divided into several sections, starting with the company background and the background of the construction project. The observation found that conventional slab construction is not as easy as it looks. It involves many complex construction processes. In this report, briefly described the methods of construction for ground floor conventional slab. Then described in more detail about the equipment and machinery used for constructing a conventional slab. During the construction process is being carried out, some of the problems associated with slab conventional methods have been identified and the report ended with some suggestions to solve a perceived problem identified. In conclusion, this report describes in detail the process and method of slab construction to readers.

Metadata

Item Type: Monograph (Industrial Training)
Creators:
Creators
Email / ID Num.
Abdullah, Nuraini
2011180949
Contributors:
Contribution
Name
Email / ID Num.
Thesis advisor
Abdullah Halim, Anas Zafirol
UNSPECIFIED
Subjects: T Technology > TH Building construction > Building fittings and their installation
Divisions: Universiti Teknologi MARA, Perak > Seri Iskandar Campus > Faculty of Architecture, Planning and Surveying
Keywords: conventional slab construction, equipment, machineries
Date: 2014
URI: https://ir.uitm.edu.my/id/eprint/81114
Edit Item
Edit Item

Download

[thumbnail of 81114.pdf] Text
81114.pdf

Download (41MB)

ID Number

81114

Indexing

Statistic

Statistic details