Mansor, Mohamad Hisyam
(2000)
Experimental and investigation on parallel operation of three phase transformer for star-delta and delta-delta connections / Mohamad Hisyam Mansor.
Degree thesis, Universiti Teknologi MARA (UiTM).
Abstract
Parallel operation of transformer involves two or more transformers connected to carry a common load. In order that two or more transformer may operate satisfactorily in parallel it is necessary to fulfill their requirement. The requirement which need to parallel the transformer are the voltage ratio, impedance, phase sequence and also the polarity. The aim of this paper is understudying the requirement for parallel three-phase transformer and the condition when loading with the combination of load. To achieve this, several test has been done including polarity test, phase sequence test, open circuit test, short circuit test and load tests.
Metadata
Item Type: | Thesis (Degree) |
---|---|
Creators: | Creators Email / ID Num. Mansor, Mohamad Hisyam UNSPECIFIED |
Contributors: | Contribution Name Email / ID Num. Thesis advisor Kahar, Mohd Idris UNSPECIFIED |
Subjects: | T Technology > TK Electrical engineering. Electronics. Nuclear engineering |
Divisions: | Universiti Teknologi MARA, Shah Alam > Faculty of Electrical Engineering |
Programme: | Bachelor of Electrical Engineering (Hons) |
Keywords: | Parallel operation, power losses, line voltages, phase voltages |
Date: | 2000 |
URI: | https://ir.uitm.edu.my/id/eprint/77908 |
Download
Text
77908.pdf
Download (154kB)
77908.pdf
Download (154kB)
Digital Copy
Digital (fulltext) is available at:
Physical Copy
Physical status and holdings:
Item Status:
On Shelf