Abstract
This report briefly describes the processes and methods involved in the preliminary construction of an industrialised building system also known as 18S in construction. It was developed based on the experience of a four and half-month detention at a construction site. This report is divided into several parts and started with the title report, objectives, company background and construction project background. The title of this report is the preliminary construction of industrialised building system and the objective that was conducted to completed the research. The company background was explaining some things about the company where the practical training of students located. It is start with an introduction followed by objectives, information on companies and managers, organisational charts and concluded with a list of completed projects and undergoing projects. The construction project background was discussed and explained in detail that describes the selected topic and all the resources only available from the project site.
Metadata
Item Type: | Monograph (Industrial Training) |
---|---|
Creators: | Creators Email / ID Num. Mohamad Shaffiee, Saifulhisham 2011416386 |
Contributors: | Contribution Name Email / ID Num. Thesis advisor Yusef, Mohd Reeza UNSPECIFIED Thesis advisor Abdullah Halim, Anas Zafirol UNSPECIFIED Thesis advisor Abdullah, Mohd Rofdzi UNSPECIFIED |
Subjects: | T Technology > TH Building construction > Systems of building construction. Industrialized building |
Divisions: | Universiti Teknologi MARA, Perak > Seri Iskandar Campus > Faculty of Architecture, Planning and Surveying |
Programme: | Diploma in Building |
Keywords: | industrialised building system, precast half slab, beam and column |
Date: | 2013 |
URI: | https://ir.uitm.edu.my/id/eprint/77667 |