Coordination and controlling method for construction project / Zaiti Kamsan

Kamsan, Zaiti (2006) Coordination and controlling method for construction project / Zaiti Kamsan. Degree thesis, Universiti Teknologi MARA (UiTM).

Abstract

This dissertation report is based on a study about findings and analysis of coordination (scheduling) and controlling (planning) method for construction project. The comparisons case study are made in term of planning and scheduling techniques to give better management in time monitoring using method of network analysis Critical Path Method (CPM). Objectives of this study are to identify the application of CPM in construction industry and its effectiveness. However, the application CPM needs expertise and experienced person to built effective and efficient in time monitoring, management resources and materials. In addition to, delay in construction project silently exist even used CPM as a guide to resolve problems. The recommendations are given to upgrade the performances of CPM as a method to coordinate and control construction projects to avoid any delay which uneconomically in terms of labour, material, machinery and money.

Metadata

Item Type: Thesis (Degree)
Creators:
Creators
Email / ID Num.
Kamsan, Zaiti
2004110599
Contributors:
Contribution
Name
Email / ID Num.
Thesis advisor
Mohd Amin, Ghazali
UNSPECIFIED
Divisions: Universiti Teknologi MARA, Shah Alam > Faculty of Architecture, Planning and Surveying
Programme: Bachelor of Building Surveying (Hons)
Keywords: Construction, Coordination, Critical Path Method
Date: 2006
URI: https://ir.uitm.edu.my/id/eprint/73883
Edit Item
Edit Item

Download

[thumbnail of 73883.pdf] Text
73883.pdf

Download (125kB)

Digital Copy

Digital (fulltext) is available at:

Physical Copy

Physical status and holdings:
Item Status:
On Shelf

ID Number

73883

Indexing

Statistic

Statistic details