Cadangan kerja-kerja peningkatan/ menaiktaraf pelabuhan perikanan LKIM Kuala Kedah, Kedah Darulaman / Mohamad Zain Hashim and Uda Saad

Hashim, Mohamad Zain and Saad, Uda (2022) Cadangan kerja-kerja peningkatan/ menaiktaraf pelabuhan perikanan LKIM Kuala Kedah, Kedah Darulaman / Mohamad Zain Hashim and Uda Saad. Bulletin. Unit Penerbitan FKAPP.
Abstract

INTRODUCTION
The upgrade work was done on the need for this jetty which has been damaged and eroded due to the effects of sea water and the effects of tremors and shocks by the landing of fishing boats. This work is regulated by the Kota Setar District PWD which needs to be completed within 96 weeks. The scope of work involved is as follows; Site clearing works, Jetty repair works, Demolished works, Architectural works, Civil and structure works.

WORKS AT THE LANDING JETTY
The fish landing jetty is a major structure in need of immediate repairs and upgrades that will be used by fishing boats. The main scope of work at this jetty are as followed; Concrete repair works, Bollard system and Pile repairs.

Item Details
Edit Item
Edit Item
Downloads & Files
[thumbnail of 69654.pdf]
Text
69654.pdf
Download (675kB)
Indexing & Metrics