Productivity improvement through "next cell" approach: a study case at motor winding assembly line of air conditioning compressor / Mat Hisham Mohamed

Mohamed, Mat Hisham (2010) Productivity improvement through "next cell" approach: a study case at motor winding assembly line of air conditioning compressor / Mat Hisham Mohamed. Masters thesis, Universiti Teknologi MARA (UiTM).

Abstract

The objective of this study is to improve productivity of the assembly line in air conditioning compressor factory through Next Cell approach. One air conditioning compressor assembly factory had been chosen as a subject for the study. The subjects were non-productive (non-value added) jobs at the assembly section of the factory. The element examined was the productivity level which affected by non-productive or waste of the raw material, work-in-process, process cycle time and human motion. Four sets of data were collected during the study. The raw material and work-in-process data for the entire line were collected while the process cycle time and operator motion was analyzed and simulated by using line balancing and "Standard Operation Combination Table" (SOCT). The total line efficiency and productivity index was calculated. The process cycle time and operator motion analysis were conducted in order to obtain the relationship between the productivity and non-productive job. As a result, there is the productivity improvement with the elimination or reduction of established nonproductive job or waste.

Metadata

Item Type: Thesis (Masters)
Creators:
Creators
Email / ID Num.
Mohamed, Mat Hisham
2008265878
Contributors:
Contribution
Name
Email / ID Num.
Thesis advisor
Omar, Abdul Rahman
UNSPECIFIED
Subjects: H Social Sciences > HD Industries. Land use. Labor > Management. Industrial Management > Industrial productivity
T Technology > TK Electrical engineering. Electronics. Nuclear engineering > Dynamoelectric machinery and auxiliaries.Including generators, motors, transformers
Divisions: Universiti Teknologi MARA, Shah Alam > Faculty of Mechanical Engineering
Programme: Master of Engineering Management
Keywords: Productivity, Next Cell, non-productive job
Date: 2010
URI: https://ir.uitm.edu.my/id/eprint/65634
Edit Item
Edit Item

Download

[thumbnail of 65634.pdf] Text
65634.pdf

Download (130kB)

Digital Copy

Digital (fulltext) is available at:

Physical Copy

Physical status and holdings:
Item Status:
On Shelf

ID Number

65634

Indexing

Statistic

Statistic details