Abstract
This book tells the story of a group of students that selected the building with the case study requirement like the building must be at least Certified Green Building by GBI with minimum one (1) years operation or the building must be large building (large scale building i.e commercial building with inclusive of shopping mall, factory or etc.) and shall be built in 2005 and above, equipped with advanced technology with minimum 2 years operation or medium rise buildings (6 storeys and above i.e office building, institution building, hotel or etc.), and shall be built in 2005 and above, equipped with advanced technology with minimum 2 years operation. So, we selected the requirement number 3 which is medium rise buildings (6 storeys and above i.e office building, institution building, hotel or etc.), and shall be built in 2005 and above, equipped with advanced technology with minimum 2 years operation. We selected the building of Jaya 33 Cybercentre as a case study where this building was built in 2008 and operational in 2011. It is located at Jalan Semangat Petaling Jaya Selangor. There are 16 storey of the building that have office space, retail podium and car park. Then, to maintained the building this building have 14 type of out-source of maintenance for example out-source for air-conditioning, building automatic system (B.A.S), cleaning, fire fighting and others. They was maintain by daily, weekly, monthly, 3 monthly, 6 monthly and yearly. Furthermore, the building design and concept of Jaya33 is hyper office was therefore conceptualized differently. Jaya33 is possibly the first Malaysian hyper office that focuses on space and versatility, potential and flexibility that space offers. then, we was measured and know the type and the size of element in Jaya 33 such as column, beam, staircase, wall, roof, window, door and others. Building services and facilities are responsible for the design, installation, operation and monitoring of the mechanical, electrical and public health systems required for the safe, comfortable and environmentally friendly operation of modern buildings. Then, we was analyse the building of Jaya 33. We found of 14 defect in the building which is crack, chipped, gap, hole, broken, peeling of paint, stain mark, missing and come off. We was create the BARIS, defect sheet, remedies and costing for this building. More over, Jaya 33 Sdn. Bhd. had recognized the implementation of the maintenance strategy and their brought all current maintenance practices and operations together to provide a maintenance strategic to ensure the quality of work and to satisfied their client. Then, in this building, they have the financial for their company. So, we was create the cash flow for 3 years from 2017 to 2019. From the cash flow, we can analyse the total income source, expenditure income source and the maintenance budget from 2016 to 2019.
Metadata
Item Type: | Student Project |
---|---|
Creators: | Creators Email / ID Num. Mat Yusof, Mohammad Nor Misuari 2014697682 Ruzlan, Muhammad Ariff Imran 2014497236 Abdullah, Syahir Nabil 2014464752 Ismail, Farisha Farhana 2014898042 Md Hashim, Siti Nornazira 2014468384 |
Contributors: | Contribution Name Email / ID Num. Thesis advisor Ahmad Zawawi, Zuraihana UNSPECIFIED |
Subjects: | T Technology > TH Building construction T Technology > TH Building construction > Maintenance and repair T Technology > TH Building construction > Building inspection |
Divisions: | Universiti Teknologi MARA, Perak > Seri Iskandar Campus > Faculty of Architecture, Planning and Surveying |
Programme: | Diploma in Building Surveying |
Keywords: | Maintenance management; Maintenance policy; Maintenance planning |
Date: | 2016 |
URI: | https://ir.uitm.edu.my/id/eprint/65434 |
Download
65434.pdf
Download (343kB)