Phases in development project, supervision, co-ordination. and project management and problems incurred and relate. Case Study: Wangsa Maju Entreprenuership (Hawthornden Estate)/ Siti Aminah Haji Abdul Aziz

Abdul Aziz, Siti Aminah (1985) Phases in development project, supervision, co-ordination. and project management and problems incurred and relate. Case Study: Wangsa Maju Entreprenuership (Hawthornden Estate)/ Siti Aminah Haji Abdul Aziz. Degree thesis, Universiti Teknologi MARA.

Abstract

Wangsa Maju Newtownship the epitome of an ideal, well planned township, designed to promote the spirit of neighbourhood among residents. It is designed in accordance with the structure plan, equipped with socio-economic facilities and modern infrastructures. In line with the Government policies to provide better housing for the low income earners, the development pattern of Wangsa Maju Newtownship consists of 5 storeys walk-up flats surrounded by pedestrian malls free from traffic . Along the walkways are the green belts. The development of Wangsa Maju Newtownship is the first joint-venture project undertaken by Dewan Bandaraya Kuala Lumpur and Peremba Berhad. It is envisaged that this pioneer project will bring success not only to Dewan Bandaraya but to the implementation of the Malaysia "incorporated Concept" introduced by the Government.

Metadata

Item Type: Thesis (Degree)
Creators:
Creators
Email / ID Num.
Abdul Aziz, Siti Aminah
UNSPECIFIED
Subjects: N Fine Arts > NA Architecture
Divisions: Universiti Teknologi MARA, Shah Alam > Faculty of Architecture, Planning and Surveying
Date: 1985
URI: https://ir.uitm.edu.my/id/eprint/641
Edit Item
Edit Item

Download

[thumbnail of TB_SITI AMINAH HAJI ABDUL AZIZ AP 85_5 P01.pdf]
Preview
Text
TB_SITI AMINAH HAJI ABDUL AZIZ AP 85_5 P01.pdf

Download (107kB) | Preview

Digital Copy

Digital (fulltext) is available at:

Physical Copy

Physical status and holdings:
Item Status:

ID Number

641

Indexing

Statistic

Statistic details