To reduce maximum demand during peak hours and to estimate the future loads of ITM / Norshahidah Mohd Nordin and Jaslina Zakaria

Mohd Nordin, Norshahidah and Zakaria, Jaslina To reduce maximum demand during peak hours and to estimate the future loads of ITM / Norshahidah Mohd Nordin and Jaslina Zakaria. [Student Project] (Unpublished)

Abstract

This project present how, to analyse and to reduce the maximum demand during peak hours and also to estimate the future load in Mara Institute of Technology. As the content indicates, the readers is given a brief introduction on how to analyse load distribution in ITM. First major substation were choosen, graph were then plotted due to voltage and current taken. All graph plotted by using lotus 123. From Graph plotted the load analysis distributed were analysed. Estimation for future load were made based on floor area using certain factors that provided by J.K.R Standard. From this estimation, the transformer rating also could be estimated by using appropriate diversity factor. Suggestions and problems also taken into consideration. Lastly, we hope that other student will continue this analysis for future used with better information and data.

Metadata

Item Type: Student Project
Creators:
Creators
Email / ID Num.
Mohd Nordin, Norshahidah
85798567
Zakaria, Jaslina
85791205
Contributors:
Contribution
Name
Email / ID Num.
Advisor
Abdullah, Mohd. Zaki
UNSPECIFIED
Divisions: Universiti Teknologi MARA, Shah Alam > Faculty of Electrical Engineering
Programme: Advanced Diploma in Electrical (Power) Engineering
Keywords: Peak hours, maximum demand, diversity factor
URI: https://ir.uitm.edu.my/id/eprint/62553
Edit Item
Edit Item

Download

[thumbnail of 62553.pdf] Text
62553.pdf

Download (115kB)

Digital Copy

Digital (fulltext) is available at:

Physical Copy

Physical status and holdings:
Item Status:
On Shelf

ID Number

62553

Indexing

Statistic

Statistic details